Aircraft Familiarization Training Center

Atlantic City, NJ

Thousands of newly recruited Air Marshals needed a new training facility in response to the attacks of September 11, 2001.

To address this need quickly, the Federal Aviation Administration (FAA) called for the fast-track construction of a facility within the William J Hughes Tech Center at the Atlantic City International Airport.

Conti managed the design-build of the FAA’s Federal Air Marshal training facility in less than 120 days. In addition to constructing the pre-engineered building, Conti performed site work, furnishing of the building and interior work, including installation of mechanical, electrical and plumbing systems. At project completion, Conti had installed a facility outfitted with a close-combat training quarters, training classrooms, a large high bay training area, an office and management area, bathroom facilities, a cafeteria and a remote operated audio/visual system.

During filling and grading operations, Conti used high early strength concrete mixes to allow the facility’s foundation to be loaded as early as possible to keep on schedule. Conti also maintained the aggressive schedule by performing site work concurrently with building construction, requiring close coordination between crews, and working around the clock. In addition to working quickly, Conti completed these operations on an active operational airport. This required crews to maintain access to stationary airplanes used in training at all times, which Conti accomplished by planning activities carefully and coordinating with the airport daily.

Conti designed, built and furnished the entire training center in just 120 days on a fast-track schedule.

Project details

Client Federal Aviation Administration
Value $5.3M
Status Project Completed
Key features
  • Design-build project
  • Constructed pre-engineered steel structure
  • Laid structural foundations and grade beams
  • Managed design
  • Installed site utilities
  • Performed site preparation and restoration (excavation, grading, soil erosion, pavement, topsoil and seed)

Harrison South West Station and Head House

Harrison South West Station and Head House

The small town of Harrison, NJ, formerly an industrial center, is re-inventing itself as a major commuter hub for travel to New York City.

Read more

Port Newark Corbin Street Berth 3 Reconstruction

Port Newark Corbin Street Berth 3 Reconstruction

Reconstruction of essential culvert and road realignment at the third largest port in the country.

Read more

Newark Airport Terminal A Bridges

Newark Airport Terminal A Bridges

As America's oldest airfield and home to the first commercial airline terminal, Newark Liberty International Airport (EWR) Terminal One Redevelopment project will set a new standard for air travel