I-295 Fayetteville Outer Loop

Fayetteville, NC

As part of a major highway construction program, this project will reduce traffic congestion by linking roadways throughout North Carolina.

​Under a program to link all major highway arteries in North Carolina, the North Carolina Department of Transportation (NCDOT) has contracted a total of 478 major and minor infrastructure construction projects across Interstate 95.

These projects are designed to reduce traffic congestion throughout North Carolina by connecting the highway with major roads. To date, construction on one segment of the route has reached completion while many others are underway. The entire 36-mile Outer Loop route’s projected path will take the freeway from I-95 at its current intersection with US 13 to the west and south of Fayetteville reconnecting with I-95 north of St. Pauls in Robeson County.

Conti is constructing a new 6.8-mile stretch of interstate highway from Cliffdale Road to the east of the All American Freeway under the program. This includes grading, paving, ground improvements, excavation and disposal of regulated material, utility installation, traffic control, sheeting and piling, formwork, reinforcing steel and concrete, superstructure demolition and erection, retaining walls and noise barriers and sign structures.

Conti’s project management team is working closely with NCDOT and other stakeholders to incorporate this project into the larger Fayetteville Outer Loop program. This includes conducting daily and monthly status update meetings with the client. This project and many others under the Outer Loop construction plan are highly public, so Conti is performing regular community outreach sessions to provide progress updates and address concerns.

Project details

Client North Carolina DOT
Value $140M
Status Under Construction
Key features
  • Constructed 6.8 miles of interstate highway
  • Graded, paved and implemented ground improvements
  • Managed traffic
  • Communicated with public
  • Constructed noise barriers
  • Excavated and disposed of contaminated material

Volvo Interchange Design-Build

Volvo Interchange Design-Build

SCDOT needed a new interchange along I-26 to provide direct access to the newly-built Volvo Manufacturing Facility providing 2,000 jobs to local workers.

Read more

Route 295 Direct Connection Ph. 2

Route 295 Direct Connection Ph. 2

One of the busiest and most congested interchanges in New Jersey, the intersection of I-295, I-76 and Route 42 in Camden County handles daily traffic volumes of over 250,000 vehicles and has one of the highest accident rates in the state.

Read more

Newark Airport Fuel Pipeline Modification

Newark Airport Fuel Pipeline Modification

At one of the world’s largest and most heavily trafficked airports, Conti helps Newark Liberty maintain its aviation fueling system to industry and environmental standards.

Read more