Gulf Coast Jetty and Dike Repairs

Gulf Coast, TX

Conti performed this design-build project repairing major jetty and dike systems to protect communities in six locations along the Gulf of Mexico.

Record-setting hurricane seasons have a history of wreaking havoc on the Gulf of Mexico. Destruction caused by hurricanes Dolly and Ike left huge repairs needed to the coastal defense systems meant to withstand them. Among these systems are numerous jetties and dikes protecting Texas and Louisiana coastlines which are critical to community and state economies as they support commercial maritime traffic, tourism and recreational activities.

Conti performed this design-build project to repair major jetty and dike systems in six locations along the Gulf of Mexico: Galveston, Freeport and Brazos Island Harbors, Matagorda Ship Channel, Sabine-Neches Waterway and the Texas City Dike. The team performed a survey at each location to determine if stone was recoverable before commencing construction and worked closely with United States Coast Guard to monitor Maritime Security levels for active traffic.

Using excavators stationed on barges 2-3 miles off-shore, Conti recovered and placed new stone in 100 linear-foot segments. This ensured the smaller base stone of the jetties was sealed with cover stone before work crews moved to the next section, reducing the risk of newly placed stones being washed away by swells. Conti also conducted detailed surveys using Real Time Kinematic sonar equipment to confirm quality stone placement and repairs. In addition to the logistic difficulties of excavating from a barge, Conti continually battled the weather, and flooding of the Mississippi River made coordinating stone shipments difficult.

The team completed the project 18 months ahead of schedule.

Engineering News-Record awarded this project the Best Water/Environment Project of 2015 in the Texas and Louisiana region.

Project details

Client USACE Galveston
Value $51.7M
Status Completed
Key features
  • Surveyed and documented stone placement
  • Excavated and removed submerged stones
  • Shaped and placed blanket, core and filler stone
  • Controlled erosion
  • Worked off marine barges

Volvo Interchange Design-Build

Volvo Interchange Design-Build

SCDOT needed a new interchange along I-26 to provide direct access to the newly-built Volvo Manufacturing Facility providing 2,000 jobs to local workers.

Read more

Route 295 Direct Connection Ph. 2

Route 295 Direct Connection Ph. 2

One of the busiest and most congested interchanges in New Jersey, the intersection of I-295, I-76 and Route 42 in Camden County handles daily traffic volumes of over 250,000 vehicles and has one of the highest accident rates in the state.

Read more

I-295 Fayetteville Outer Loop

I-295 Fayetteville Outer Loop

As part of a major highway construction program, this project will reduce traffic congestion by linking roadways throughout North Carolina.

Read more