The last project in the $450 million infrastructure upgrade, called the Secaucus Interchange and Rail Transfer Station Program (SIP), was to connect 11 rail lines in northern New Jersey to reduce passenger commute times and increase destinations.

The program included the construction of a new rail station, expansion of the rail line from two to four tracks, and development of an $84 million interchange on the New Jersey Turnpike expressway (I-95). This portion of the project entailed constructing bridges and expanding local roads in Secaucus to handle the increase in traffic.

Conti rehabilitated the New Country Road bridges (SIP 501 project). Work included a dual-span bridge built over a rail yard and a single-span bridge built over ramps leading to a busy roadway. The team coordinated daily with Norfolk Southern, Conrail, and Hudson County to develop a detour that would minimize traffic impact and support extensive truck traffic.

Conti handled utility relocations for electrical, gas, telecom, sanitary, drainage, and fiber-optic lines. The team drove steel sheeting down the center of the road and built a temporary ramp to separate live traffic from work operations. Conti also developed a wetland mitigation and enhancement plan.

The team used an innovative slip form design mix technique during the concrete bridge parapet construction process, as well as re-staging work to meet an aggressive fast tracked schedule for the project. This and other time- and money-saving techniques won Conti excellent reviews from the NJTA.

“Conti’s team approach and positive attitude were key to maintaining schedules in a highly congested area with numerous constraints.” – Assistant Chief Engineer, Construction, NJTA

Project details

Client New Jersey Turnpike Authority
Value $18.7M
Status Project Completed
Key features
  • Construction of simple- and dual-span bridges (1,165,000 pounds and 2,500 cubic yards concrete)
  • Installation of retaining walls, mechanically stabilized earth and cast-in-place (45,000 square feet)
  • Demolition of 72-inch steel pipe (3,700 linear feet)
  • Installation of storm pipe and structures (4,300 linear feet)
  • Construction of a sanitary pump station
  • Excavations (18,000 cubic yards)

Volvo Interchange Design-Build

Volvo Interchange Design-Build

SCDOT needed a new interchange along I-26 to provide direct access to the newly-built Volvo Manufacturing Facility providing 2,000 jobs to local workers.

Read more

Route 295 Direct Connection Ph. 2

Route 295 Direct Connection Ph. 2

One of the busiest and most congested interchanges in New Jersey, the intersection of I-295, I-76 and Route 42 in Camden County handles daily traffic volumes of over 250,000 vehicles and has one of the highest accident rates in the state.

Read more

I-295 Fayetteville Outer Loop

I-295 Fayetteville Outer Loop

As part of a major highway construction program, this project will reduce traffic congestion by linking roadways throughout North Carolina.

Read more