The US's largest airport system was overwhelmed with customers.

‚ÄčAs part of this vital transportation hub in the Greater New York City area, Newark Liberty International Airport sought to reduce congestion in its A and B terminals and increase ease of access for incoming travelers. To accomplish this, the Port Authority of New York and New Jersey (PANYNJ) planned a major reconstruction effort for these airport terminals, which would include the complete reconstruction of many of the terminal's features to accommodate greater traffic and alleviate congestion.

Conti reconstructed the roadway for each terminal including a two-lane bridge leading into the Central Terminal, which effectively increased traffic flow. In addition, Conti constructed an architectural steel and glass pedestrian walkway canopy, as well as multiple toll plazas. The team performed the work in carefully planned stages to minimize inconvenience to the public during the construction phase. Conti also installed and relocated numerous utilities, including a 36-inch saltwater line, a 24-inch storm water force main, and a 12-inch water line. The team utilized a state-of-the-art steel fabrication shop to manufacture steel for the 50,000 square foot canopy structure.

In the days following the September 11, 2001 attacks, Conti worked with the Port Authority to quickly lock down the airport and maintain security measures, such as erecting traffic barriers and requiring ID badges at all times at the airport.

Conti completed this project safely and on time while working on an active airport and overcoming delays from the September 11 attacks.

Project details

Client Port Authority of New York and New Jersey
Value $50M
Status Project Completed
Key features
  • Construction of frontage road
  • Improvements to parking lots
  • Construction of a bridge
  • Installation of piles
  • Construction of retaining walls
  • Installation of toll plazas
  • Installation of steel and glass canopy
  • Disposal of excess excavated soil
  • Maintenance of traffic items

Volvo Interchange Design-Build

Volvo Interchange Design-Build

SCDOT needed a new interchange along I-26 to provide direct access to the newly-built Volvo Manufacturing Facility providing 2,000 jobs to local workers.

Read more

Route 295 Direct Connection Ph. 2

Route 295 Direct Connection Ph. 2

One of the busiest and most congested interchanges in New Jersey, the intersection of I-295, I-76 and Route 42 in Camden County handles daily traffic volumes of over 250,000 vehicles and has one of the highest accident rates in the state.

Read more

I-295 Fayetteville Outer Loop

I-295 Fayetteville Outer Loop

As part of a major highway construction program, this project will reduce traffic congestion by linking roadways throughout North Carolina.

Read more